| Date | Lecture | Office Hours |
Project/Assignment | Hand-in |
| Week 1 |
Mon 8/25 |
Lecture: Course overview.
Video: 17 Incredible 3D-Printed
Objects
Article and video on Ghost Guns |
|
(A) IDeATe laser cutter info.
(B) Laser cutter safety module.
(C) Quick Start Guide
|
Software setup: install SolidWorks
Choose your fire extinguisher training session 9/9 or 9/10 or a
later date. |
| Wed 8/27 |
Introduction to SolidWorks, part 1: sketches,
dimensions, relations, extruded base, extruded cut, fillets. |
|
#1: Make a Spirograph |
|
| Fri 8/29 |
|
Dave 3-4 pm |
|
|
| |
| Week 2 |
Mon 9/1 |
No class. Labor Day. |
|
|
|
| Tue 9/2 |
|
Avery 5-6 pm |
|
|
| Wed 9/3 |
Laser cutter intro.
Introduction to SolidWorks, part 2: configurations,
assemblies, mates, drawings, DXF files.
Sample part: StandPiece1.SLDPRT |
|
Browse
the Fusion
Series System Manual to learn about our laser cutters.
|
|
| Fri 9/5 |
|
Dave 3-4 pm |
|
|
| |
| Week 3 |
Mon 9/8 |
Lecture: DXF file format.
SolidWorks part 3:
splines, trim, kerf compensation, interference check, hole wizard. |
|
Watch Gear 1
and Epilog Quick-Start Tutorial
#2. Tree Generator |
Spirograph files due |
| Tue 9/9 |
|
Avery 5-6 pm |
|
Fire extinguisher training 2:30 PM in Hunt A4 |
| Wed 9/10 |
Lecture: Working in 3D.
SolidWorks part 4: revolves, lofts, shell, and flex.
See these
Flex Examples
from SolidWorks online help. |
|
Technology Presentation |
Spirograph post due;
Fire extinguisher training 10 AM in Hunt 106C |
| Fri 9/12 |
|
Dave 3-4 pm |
|
|
| |
| Week 4 |
Mon 9/15 |
Intro to the Array 3D Printer.
In-class project: make a molecule. |
|
#3. Molecule design and
3D Printing Service
|
Trees files due |
| Tue 9/16 |
|
Avery 5-6 pm |
|
|
| Wed 9/17 |
Lecture: STL file format. Slicing algorithms.
STL demo files.
Technology presentations (slides)
|
|
|
Technology presentation slide due by 5pm
Trees post due |
| Fri 9/19 |
|
Dave 3-4 pm |
|
|
| |
| Week 5 |
Mon 9/22 |
Equations and design tables in SolidWorks. |
|
#4. Duck rendering. |
Molecule files due |
| Tue 9/23 |
|
Avery 5-6 pm |
|
|
| Wed 9/24 |
Lecture: Design tricks for mechatronics and robotics.
Laser-Cut Enclosure Design:
advice from Adafruit Industries.
Laser cutter origami.
3D Printed Fabric
Shopping at McMaster-Carr. |
|
#5. Final project |
|
| Fri 9/26 |
|
Dave 3-4 pm |
|
|
| |
| Week 6 |
Mon 9/29 |
Lecture: CSWA part 1: Drawings, annotations, and part properties.
Reference: SOLIDWORKS Certification Exam Guide & Practice Test
Video: Solidworks CSWA practice exam
Partial Part4.SLDPRT
|
|
Materials Presentation |
Molecule post due Duck files due |
| Tue 9/30 |
|
Avery 5-6 pm |
|
|
| Wed 10/1 |
Lecture: Solidworks CSWA exam part 2.
Part file Basic_Part_4.SLDPRT.
Part file Hunk3.SLDPRT.
Parts for chain assembly
Video tutorial. |
|
|
|
| Fri 10/3 |
|
Dave 3-4 pm |
|
|
| |
| Week 7 |
Mon 10/6 |
Materials Presentations: (slides)
Slotted box |
|
|
Materials presentation slide due by 5pm Duck post due |
| Tue 10/7 |
|
Avery 5-6 pm |
|
|
| Wed 10/8 |
Surfaces and hinges. |
|
|
|
| Fri 10/10 |
No more classes. Final projects due. |
Dave 3-4 pm |
|
Final projects due |